Scroll Top
Ridgefield WA 98642

August 28, 2017 Shop Log

img_2115
  • I worked on mounting brackets for the next solar recharging station. Instead of being mounted to square perforated tube, this station will be mounted to a round solid tube. I used the Shapeoko to cut out the (4) pieces for the mounting blocks, two pieces per block. I glued the two pieces together. For better hold on the round tube, I cut a 5° angle on the mounting surface to the second half of the French cleat.
  • I did some more experimentation with the FSL Muse Laser Engraver and Cutter. More trout with A River Runs Through It quotes…
  • Did a trash and recycling run.
  • Allowing the solar recharging station catch some last rays of sun…

Related Posts